Biltmore Seismic Retrofit

TYPE: Seismic Retrofit

PROJECT OVERVIEW

PROJECT OVERVIEW

7 Story 134 Unit building with acquired PML under 20%

  • Repointing Brick grout lines
  • Electrical upgrades
  • Zane Kanyer, PE Associate Principal SSF Engineers
  • Two early 1900 boilers replaced
  • Initialing contracted to replace boilers and was able to significantly save the owner thousands of dollars while simultaneously completing a voluntary seismic upgrade.